The obligation
Before commencing removal, the PCBU must prepare an asbestos removal control plan that identifies hazards, control measures, PPE, air monitoring, and emergency procedures.
The Code requires a written asbestos removal control plan before work starts. The plan must address: identification and assessment of the ACM; control measures (e.g. wet methods, enclosure); PPE requirements; air monitoring strategy; decontamination procedures; emergency response; and waste disposal. The plan must be available at the workplace and reviewed if circumstances change.
- What
- Before commencing removal, the PCBU must prepare an asbestos removal control plan that identifies hazards, control measures, PPE, air monitoring, and emergency procedures.
- Source
- worksafe.wa.gov.au
description
Full analysis
lock
Free account
tips_and_updates
What this means for you
lock
Free account
lock_open
Read the full analysis, tailored to your industry
- star
Impact summary tailored to your industry
- check_circle
Full plain-English analysis of what changed
- check_circle
Email alerts & digests when this law changes
- check_circle
Compliance self-assessment tools
Labels
asbestos
control plan
documentation
risk assessment
Official sources
Frequently asked questions
Which WHS law does this come from?
Asbestos removal control plan is a WHS requirement set out in How to safely remove asbestos (WA). It is made under Work Health and Safety Act 2020 (WA). The relevant provision is How to safely remove asbestos > Removal control plan.
What does this WHS obligation require?
Asbestos removal control plan is a WHS obligation under How to safely remove asbestos (WA). In short, Before commencing removal, the PCBU must prepare an asbestos removal control plan that identifies hazards, control measures, PPE, air monitoring, and emergency procedures.
What changed recently?
Asbestos removal control plan was last updated on 27 August 2026.