Monitor

Air monitoring during asbestos removal

High severity
WA · Asbestos How to safely remove asbestos > Air monitoring
The obligation
The Code mandates air monitoring during and after Class A removal work to ensure fibre levels remain within exposure standards and the area is safe for re-occupation.
Air monitoring must be conducted by a competent person during Class A removal to verify control effectiveness and confirm airborne fibre levels do not exceed the workplace exposure standard (0.1 fibres/mL TWA). A clearance air monitoring assessment is required after removal before the enclosure is removed and the area re-occupied. Records must be kept.
What
The Code mandates air monitoring during and after Class A removal work to ensure fibre levels remain within exposure standards and the area is safe for re-occupation.
Source
worksafe.wa.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Labels
asbestos air monitoring exposure standard Class A clearance
Official sources
Frequently asked questions

Which WHS law does this come from?

Air monitoring during asbestos removal is a WHS requirement set out in How to safely remove asbestos (WA). It is made under Work Health and Safety Act 2020 (WA). The relevant provision is How to safely remove asbestos > Air monitoring.

What does this WHS obligation require?

Air monitoring during asbestos removal is a WHS obligation under How to safely remove asbestos (WA). In short, The Code mandates air monitoring during and after Class A removal work to ensure fibre levels remain within exposure standards and the area is safe for re-occupation.

What changed recently?

Air monitoring during asbestos removal was last updated on 27 August 2026.

About this Topic

Updates trackedMonitoring
Monitoring detail
First seenAug 2026