Monitor

Designer duty to eliminate/minimise risks across lifecycle

Code version as at 1 Oct 2018 From Safe design of structures, no changes tracked yet
High severity
SA · Safe Design Safe design of structures > Designer duties § 2
The obligation
PCBUs who design structures intended as workplaces must eliminate or, if not reasonably practicable, minimise health and safety risks for all lifecycle phases: construction, use, maintenance and demolition.
Under the WHS Act 2012 (SA) and this Code, a designer of a structure (including architects, engineers and building designers) must: (a) identify foreseeable hazards that could arise during construction or use; (b) eliminate risks so far as reasonably practicable, or minimise them; (c) consider the full lifecycle of the structure. The Code provides the practical guidance deemed to satisfy these duties.
What
PCBUs who design structures intended as workplaces must eliminate or, if not reasonably practicable, minimise health and safety risks for all lifecycle phases: construction, use, maintenance and demolition.
Source
safeworkaustralia.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Labels
safe design PCBU designer WHS Act 2012 SA
Official sources
Frequently asked questions

Which WHS law does this come from?

Designer duty to eliminate/minimise risks across lifecycle is a WHS requirement set out in Safe design of structures (SA). It is made under Work Health and Safety Act 2012 (SA). The relevant provision is Safe design of structures > Designer duties § 2.

What does this WHS obligation require?

Designer duty to eliminate/minimise risks across lifecycle is a WHS obligation under Safe design of structures (SA). In short, PCBUs who design structures intended as workplaces must eliminate or, if not reasonably practicable, minimise health and safety risks for all lifecycle phases: construction, use, maintenance and demolition.

What changed recently?

Designer duty to eliminate/minimise risks across lifecycle was last updated on 26 August 2026.

About this Topic

Updates trackedMonitoring
Monitoring detail
First seenAug 2026