The obligation
PCBUs must ensure tower cranes are designed, selected, and positioned to eliminate or minimise risks before work commences, including site assessment and structural adequacy checks.
Before erecting or using a tower crane, PCBUs must conduct hazard identification and risk assessment covering site conditions, load paths, overlapping crane radii, proximity to powerlines, and structural support. Designers and suppliers must provide information adequate for safe installation and use. Positions and configurations must be assessed by a competent person. These obligations arise under WHS Regulation provisions applied through the Code.
- What
- PCBUs must ensure tower cranes are designed, selected, and positioned to eliminate or minimise risks before work commences, including site assessment and structural adequacy checks.
- Source
- worksafe.qld.gov.au
description
Full analysis
lock
Free account
tips_and_updates
What this means for you
lock
Free account
lock_open
Read the full analysis, tailored to your industry
- star
Impact summary tailored to your industry
- check_circle
Full plain-English analysis of what changed
- check_circle
Email alerts & digests when this law changes
- check_circle
Compliance self-assessment tools
Labels
tower crane
planning
design
hazard identification
WHS
Official sources
Frequently asked questions
Which WHS law does this come from?
Planning and Design Obligations Before Using a Tower Crane is a WHS requirement set out in Tower crane code of practice 2017 (QLD). It is made under Work Health and Safety Act 2011 (QLD). The relevant provision is Tower Crane Code of Practice 2017 > Planning and Design § 2.
What does this WHS obligation require?
Planning and Design Obligations Before Using a Tower Crane is a WHS obligation under Tower crane code of practice 2017 (QLD). In short, PCBUs must ensure tower cranes are designed, selected, and positioned to eliminate or minimise risks before work commences, including site assessment and structural adequacy checks.
What changed recently?
Planning and Design Obligations Before Using a Tower Crane was last updated on 26 August 2026.