The obligation
The Code prescribes requirements for safe lifting of tilt-up and pre-cast panels, including crane capacity, rigging, lifting inserts, and SWMS obligations.
All panel lifting must be performed using cranes and rigging equipment that is correctly rated for the load. Lifting inserts must be verified compatible with the clutch system used. A Safe Work Method Statement (SWMS) is required and workers must agree to perform work in accordance with it. Special provision must be made to prevent lateral displacement at the panel base during lifting.
- What
- The Code prescribes requirements for safe lifting of tilt-up and pre-cast panels, including crane capacity, rigging, lifting inserts, and SWMS obligations.
- Source
- worksafe.qld.gov.au
description
Full analysis
lock
Free account
tips_and_updates
What this means for you
lock
Free account
lock_open
Read the full analysis, tailored to your industry
- star
Impact summary tailored to your industry
- check_circle
Full plain-English analysis of what changed
- check_circle
Email alerts & digests when this law changes
- check_circle
Compliance self-assessment tools
Labels
construction
tilt-up
precast
lifting
crane
SWMS
Official sources
Frequently asked questions
Which WHS law does this come from?
Panel Lifting Operations — Crane and Rigging Requirements is a WHS requirement set out in Tilt-up and pre-cast construction 2003 (QLD). It is made under Work Health and Safety Act 2011 (QLD). The relevant provision is Tilt-up and Pre-cast Construction 2003 > Lifting Operations.
What does this WHS obligation require?
Panel Lifting Operations — Crane and Rigging Requirements is a WHS obligation under Tilt-up and pre-cast construction 2003 (QLD). In short, The Code prescribes requirements for safe lifting of tilt-up and pre-cast panels, including crane capacity, rigging, lifting inserts, and SWMS obligations.
What changed recently?
Panel Lifting Operations — Crane and Rigging Requirements was last updated on 26 August 2026.