Structural Integrity Requirements During Steel Erection

Code version as at 1 Jul 2018 From Steel construction code of practice 2004, no changes tracked yet
High severity
QLD · WHS — Steel Construction Steel construction code of practice 2004 > Structural Integrity
The obligation
PCBUs must ensure structural integrity is maintained at all stages of steel erection, including adequate temporary bracing and sequencing of construction activities.
The code requires PCBUs to maintain structural integrity throughout erection. This includes ensuring temporary bracing is installed and maintained as specified by the structural engineer, controlling erection sequencing to prevent premature loading or instability, verifying concrete footing strength before columns are loaded, and ensuring holding-down bolts can accommodate overturning forces. Structural engineers must indicate these requirements on drawings.
What
PCBUs must ensure structural integrity is maintained at all stages of steel erection, including adequate temporary bracing and sequencing of construction activities.
Source
worksafe.qld.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Labels
structural-integrity temporary-bracing erection steel-construction
Official sources
Frequently asked questions

Which WHS law does this come from?

Structural Integrity Requirements During Steel Erection is a WHS requirement set out in Steel construction code of practice 2004 (QLD). It is made under Work Health and Safety Act 2011 (QLD). The relevant provision is Steel construction code of practice 2004 > Structural Integrity.

What does this WHS obligation require?

Structural Integrity Requirements During Steel Erection is a WHS obligation under Steel construction code of practice 2004 (QLD). In short, PCBUs must ensure structural integrity is maintained at all stages of steel erection, including adequate temporary bracing and sequencing of construction activities.

What changed recently?

Structural Integrity Requirements During Steel Erection was last updated on 26 August 2026.