The obligation
The code's design and inspection table recommends when an engineer, rather than a scaffolder or competent person, should design, verify and initially inspect scaffolds.
Section 2 Planning and design sits at the start of the code, as design and planning should both be considered before scaffolding work begins. Table 1 recommends an engineer initially inspect loading bays greater than 9 m or 2 tonnes, suspended swing-stage scaffolds, perimeter demolition scaffold more than 9 m high and public access structures.
…
- What
- The code's design and inspection table recommends when an engineer, rather than a scaffolder or competent person, should design, verify and initially inspect scaffolds.
- Source
- worksafe.qld.gov.au
description
Full analysis
lock
Free account
tips_and_updates
What this means for you
lock
Free account
lock_open
Read the full analysis, tailored to your industry
- star
Impact summary tailored to your industry
- check_circle
Full plain-English analysis of what changed
- check_circle
Email alerts & digests when this law changes
- check_circle
Compliance self-assessment tools
Frequently asked questions
Which WHS law does this come from?
Planning, design, inspection, access and platform gaps is a WHS requirement set out in Scaffolding code of practice 2021 (QLD). It is made under Work Health and Safety Act 2011 (QLD). The relevant provision is Scaffolding Code of Practice 2021 > Planning and Design.
What does this WHS obligation require?
Planning, design, inspection, access and platform gaps is a WHS obligation under Scaffolding code of practice 2021 (QLD). In short, The code's design and inspection table recommends when an engineer, rather than a scaffolder or competent person, should design, verify and initially inspect scaffolds.
What changed recently?
Planning, design, inspection, access and platform gaps was last updated on 9 October 2026.