Managing risk through the pre-design, concept and design development phases

Code version as at 1 Sep 2026 From Safe design of structures code of practice 2021, no changes tracked yet
Low severity
QLD Safe Design of Structures COP 2021 > Design Phases
The obligation
The Code recommends a systems approach that integrates risk management into each design phase and encourages collaboration between client, designer and constructor.
Safe design means integrating control measures early in the design process to eliminate or, if not reasonably practicable, minimise risks throughout the life of the structure. Safe design begins at the concept development phase, when decisions are made about the design and its purpose, materials, and methods of construction, maintenance, operation, demolition and disposal. …
What
The Code recommends a systems approach that integrates risk management into each design phase and encourages collaboration between client, designer and constructor.
Source
worksafe.qld.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Official sources
Frequently asked questions

Which WHS law does this come from?

Managing risk through the pre-design, concept and design development phases is a WHS requirement set out in Safe design of structures code of practice 2021 (QLD). It is made under Work Health and Safety Act 2011 (QLD). The relevant provision is Safe Design of Structures COP 2021 > Design Phases.

What does this WHS obligation require?

Managing risk through the pre-design, concept and design development phases is a WHS obligation under Safe design of structures code of practice 2021 (QLD). In short, The Code recommends a systems approach that integrates risk management into each design phase and encourages collaboration between client, designer and constructor.

What changed recently?

Managing risk through the pre-design, concept and design development phases was last updated on 11 October 2026.