Monitor

Risk Management Obligations for Rural Plant

Code version as at 23 Sep 2024 From Rural plant Code of Practice 2024, no changes tracked yet
High severity
QLD · Duty / Obligation Queensland > WHS > Codes of Practice > Rural Plant > Risk Management
The obligation
Code requires PCBUs to identify hazards and manage risks associated with rural plant through a hierarchy of controls, including engineering and administrative measures.
The Code sets out a risk management framework for rural plant that PCBUs must apply. This includes: identifying hazards (e.g. rollover, entanglement, crush, noise); assessing and controlling risks using the hierarchy of controls; maintaining plant in safe condition; and ensuring operators are trained and competent. The Code provides specific guidance on plant categories including tractors, self-propelled machinery, quad bikes/ATVs, and ride-on mowers.
What
Code requires PCBUs to identify hazards and manage risks associated with rural plant through a hierarchy of controls, including engineering and administrative measures.
Source
worksafe.qld.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Labels
risk management hierarchy of controls rural plant PCBU agriculture
Official sources
Frequently asked questions

Which WHS law does this come from?

Risk Management Obligations for Rural Plant is a WHS requirement set out in Rural plant Code of Practice 2024 (QLD). It is made under Work Health and Safety Act 2011 (QLD). The relevant provision is Queensland > WHS > Codes of Practice > Rural Plant > Risk Management.

What does this WHS obligation require?

Risk Management Obligations for Rural Plant is a WHS obligation under Rural plant Code of Practice 2024 (QLD). In short, Code requires PCBUs to identify hazards and manage risks associated with rural plant through a hierarchy of controls, including engineering and administrative measures.

What changed recently?

Risk Management Obligations for Rural Plant was last updated on 27 August 2026.

About this Topic

Updates trackedMonitoring
Monitoring detail
First seenAug 2026