On-site Verification, Pre-pour Inspection and Common Formwork Defects

Code version as at 1 Jul 2018 From Formwork code of practice 2016, no changes tracked yet
Medium severity
QLD WHS Act 2011 (Qld) > Codes of Practice > Formwork
The obligation
Formwork documentation must be available on site, compliance with the design must be verified and documented, and an engineer or competent person must sign off after the final pre-pour inspection.
On site there must be certification of maximum stacked loads, concrete specifications and when formwork can be removed, back propping details, and design drawings signed by an engineer or covered by a certification letter. Verification that the structure complies with the design must be documented; a checklist alone is not enough to verify compliance with Australian Standards. …
What
Formwork documentation must be available on site, compliance with the design must be verified and documented, and an engineer or competent person must sign off after the final pre-pour inspection.
Source
worksafe.qld.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Official sources
Frequently asked questions

Which WHS law does this come from?

On-site Verification, Pre-pour Inspection and Common Formwork Defects is a WHS requirement set out in Formwork code of practice 2016 (QLD). It is made under Work Health and Safety Act 2011 (QLD). The relevant provision is WHS Act 2011 (Qld) > Codes of Practice > Formwork.

What does this WHS obligation require?

On-site Verification, Pre-pour Inspection and Common Formwork Defects is a WHS obligation under Formwork code of practice 2016 (QLD). In short, Formwork documentation must be available on site, compliance with the design must be verified and documented, and an engineer or competent person must sign off after the final pre-pour inspection.

What changed recently?

On-site Verification, Pre-pour Inspection and Common Formwork Defects was last updated on 19 October 2026.

About this Topic

Updates trackedMonitoring
Monitoring detail
First seenOct 2026