Designer and supplier duties for plant and structures used in demolition

Code version as at 23 Feb 2021 From Demolition work code of practice 2021, no changes tracked yet
Medium severity
QLD Demolition work code of practice 2021 > Designers
The obligation
Designers, manufacturers, importers, suppliers and installers of plant or structures used in demolition must ensure, so far as reasonably practicable, they are without health and safety risks.
This duty includes carrying out testing and analysis and providing specific information about the plant or substance. The WHS Regulation also requires manufacturers to consult with designers of plant, and importers to consult with designers and manufacturers of plant. The Code refers designers to WHS Act section 22 and to WHS Regulation section 295, under which a designer must give a safety report to the person who commissions the design.
What
Designers, manufacturers, importers, suppliers and installers of plant or structures used in demolition must ensure, so far as reasonably practicable, they are without health and safety risks.
Source
worksafe.qld.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Official sources
Frequently asked questions

Which WHS law does this come from?

Designer and supplier duties for plant and structures used in demolition is a WHS requirement set out in Demolition work code of practice 2021 (QLD). It is made under Work Health and Safety Act 2011 (QLD). The relevant provision is Demolition work code of practice 2021 > Designers.

What does this WHS obligation require?

Designer and supplier duties for plant and structures used in demolition is a WHS obligation under Demolition work code of practice 2021 (QLD). In short, Designers, manufacturers, importers, suppliers and installers of plant or structures used in demolition must ensure, so far as reasonably practicable, they are without health and safety risks.

What changed recently?

Designer and supplier duties for plant and structures used in demolition was last updated on 19 October 2026.