The obligation
A written asbestos removal control plan must be prepared before removal work begins, covering identification, preparation, removal methods, PPE/RPE, air monitoring, decontamination, and waste disposal.
Before commencing removal work, the licensed removalist must prepare an asbestos removal control plan (ARCP). The ARCP must include: notification confirmation; identification of asbestos type, condition and quantity; consultation with HSRs and workers; assigned responsibilities; program dates; emergency plans; removal boundaries and isolation; PPE/RPE details; air monitoring (required for friable); decontamination procedures; and waste storage and disposal.
…
- What
- A written asbestos removal control plan must be prepared before removal work begins, covering identification, preparation, removal methods, PPE/RPE, air monitoring, decontamination, and waste disposal.
- Source
- safework.nsw.gov.au
description
Full analysis
lock
Free account
tips_and_updates
What this means for you
lock
Free account
lock_open
Read the full analysis, tailored to your industry
- star
Impact summary tailored to your industry
- check_circle
Full plain-English analysis of what changed
- check_circle
Email alerts & digests when this law changes
- check_circle
Compliance self-assessment tools
Labels
asbestos
control-plan
documentation
Official sources
Frequently asked questions
Which WHS law does this come from?
Asbestos Removal Control Plan Requirements is a WHS requirement set out in How to safely remove asbestos (NSW). It is made under Work Health and Safety Act 2011 (NSW). The relevant provision is How to safely remove asbestos > Asbestos Removal Control Plan § Appendix A/B.
What does this WHS obligation require?
Asbestos Removal Control Plan Requirements is a WHS obligation under How to safely remove asbestos (NSW). In short, A written asbestos removal control plan must be prepared before removal work begins, covering identification, preparation, removal methods, PPE/RPE, air monitoring, decontamination, and waste disposal.
What changed recently?
Asbestos Removal Control Plan Requirements was last updated on 13 August 2026.