The obligation
PCBUs must have a SWMS prepared before high risk demolition work starts, and must stop the work if it is not being done as the SWMS sets out.
Demolishing a load-bearing or integrity-related element of a structure is high risk construction work, so a SWMS is needed before it begins. The SWMS must state the type of high risk construction work, its hazards and risks, and how those risks will be controlled. Where more than one PCBU has this duty, they must consult and cooperate to agree who prepares it. One SWMS may cover several high risk construction activities at a workplace, or a separate SWMS can be prepared for each.
…
- What
- PCBUs must have a SWMS prepared before high risk demolition work starts, and must stop the work if it is not being done as the SWMS sets out.
- Source
- safework.nsw.gov.au
description
Full analysis
lock
Free account
tips_and_updates
What this means for you
lock
Free account
lock_open
Read the full analysis, tailored to your industry
- star
Impact summary tailored to your industry
- check_circle
Full plain-English analysis of what changed
- check_circle
Email alerts & digests when this law changes
- check_circle
Compliance self-assessment tools
Frequently asked questions
Which WHS law does this come from?
Prepare and follow a SWMS for high risk demolition work is a WHS requirement set out in Demolition work (NSW). It is made under Work Health and Safety Act 2011 (NSW). The relevant provision is Demolition work > Safe Work Method Statements.
What does this WHS obligation require?
Prepare and follow a SWMS for high risk demolition work is a WHS obligation under Demolition work (NSW). In short, PCBUs must have a SWMS prepared before high risk demolition work starts, and must stop the work if it is not being done as the SWMS sets out.
What changed recently?
Prepare and follow a SWMS for high risk demolition work was last updated on 11 October 2026.