Monitor

PCBU Duty to Manage RCS Risks — Hierarchy of Controls

Code legislation date 1 Sep 2024 From Managing the risks of respirable crystalline silica at work, no changes tracked yet
High severity
FEDERAL · Duty/Obligation Managing the Risks of Respirable Crystalline Silica at Work > Risk Management
The obligation
PCBUs must apply the hierarchy of controls to eliminate or minimise worker exposure to RCS dust, as required by the WHS Regulation and this Code.
The Code requires PCBUs to identify hazards, assess risks, and apply the hierarchy of controls to manage RCS exposure. Engineering controls (e.g. local exhaust ventilation, wet methods) are preferred over administrative controls and PPE. Air monitoring and health surveillance obligations apply where exposure limits may be exceeded.
What
PCBUs must apply the hierarchy of controls to eliminate or minimise worker exposure to RCS dust, as required by the WHS Regulation and this Code.
Source
safeworkaustralia.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Labels
silica hierarchy-of-controls LEV health-surveillance air-monitoring
Official sources
Frequently asked questions

Which WHS law does this come from?

PCBU Duty to Manage RCS Risks — Hierarchy of Controls is a WHS requirement set out in Managing the risks of respirable crystalline silica at work (FEDERAL). It is made under Work Health and Safety Act 2011 (FEDERAL). The relevant provision is Managing the Risks of Respirable Crystalline Silica at Work > Risk Management.

What does this WHS obligation require?

PCBU Duty to Manage RCS Risks — Hierarchy of Controls is a WHS obligation under Managing the risks of respirable crystalline silica at work (FEDERAL). In short, PCBUs must apply the hierarchy of controls to eliminate or minimise worker exposure to RCS dust, as required by the WHS Regulation and this Code.

What changed recently?

PCBU Duty to Manage RCS Risks — Hierarchy of Controls was last updated on 26 August 2026.

About this Topic

Updates trackedMonitoring
Monitoring detail
First seenAug 2026