The obligation
A SWMS must be prepared before high-risk construction/demolition work begins, including any work with a fall risk exceeding 2 metres.
The CoP requires a PCBU to prepare a Safe Work Method Statement (SWMS) before commencing any high-risk construction work on a demolition site. High-risk construction work includes work involving a risk of a person falling more than 2 metres, structural demolition, and work involving load-shifting machinery on suspended floors. The SWMS must identify hazards and control measures and be kept accessible on site. Further guidance is in section 3.4 of the CoP.
- What
- A SWMS must be prepared before high-risk construction/demolition work begins, including any work with a fall risk exceeding 2 metres.
- Source
- safeworkaustralia.gov.au
description
Full analysis
lock
Free account
tips_and_updates
What this means for you
lock
Free account
lock_open
Read the full analysis, tailored to your industry
- star
Impact summary tailored to your industry
- check_circle
Full plain-English analysis of what changed
- check_circle
Email alerts & digests when this law changes
- check_circle
Compliance self-assessment tools
Labels
WHS
SWMS
high-risk construction
demolition
falls
Official sources
Frequently asked questions
Which WHS law does this come from?
Safe Work Method Statement (SWMS) required for high-risk demolition work is a WHS requirement set out in Demolition work (FEDERAL). It is made under Work Health and Safety Act 2011 (FEDERAL). The relevant provision is Demolition work > SWMS § 3.4.
What does this WHS obligation require?
Safe Work Method Statement (SWMS) required for high-risk demolition work is a WHS obligation under Demolition work (FEDERAL). In short, A SWMS must be prepared before high-risk construction/demolition work begins, including any work with a fall risk exceeding 2 metres.
What changed recently?
Safe Work Method Statement (SWMS) required for high-risk demolition work was last updated on 26 August 2026.