Safe Work Method Statement (SWMS) required for high-risk demolition work

High severity
FEDERAL · Work Health & Safety Demolition work > SWMS § 3.4
The obligation
A SWMS must be prepared before high-risk construction/demolition work begins, including any work with a fall risk exceeding 2 metres.
The CoP requires a PCBU to prepare a Safe Work Method Statement (SWMS) before commencing any high-risk construction work on a demolition site. High-risk construction work includes work involving a risk of a person falling more than 2 metres, structural demolition, and work involving load-shifting machinery on suspended floors. The SWMS must identify hazards and control measures and be kept accessible on site. Further guidance is in section 3.4 of the CoP.
What
A SWMS must be prepared before high-risk construction/demolition work begins, including any work with a fall risk exceeding 2 metres.
Source
safeworkaustralia.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Labels
WHS SWMS high-risk construction demolition falls
Official sources
Frequently asked questions

Which WHS law does this come from?

Safe Work Method Statement (SWMS) required for high-risk demolition work is a WHS requirement set out in Demolition work (FEDERAL). It is made under Work Health and Safety Act 2011 (FEDERAL). The relevant provision is Demolition work > SWMS § 3.4.

What does this WHS obligation require?

Safe Work Method Statement (SWMS) required for high-risk demolition work is a WHS obligation under Demolition work (FEDERAL). In short, A SWMS must be prepared before high-risk construction/demolition work begins, including any work with a fall risk exceeding 2 metres.