Monitor

Isolation of Plant and Services Before Confined Space Entry

Code version as at 6 Aug 2025 From Confined Spaces, no changes tracked yet
High severity
ACT · Health & Safety Duty Confined Spaces Code of Practice (NI2025-443)
The obligation
All hazardous services and plant connected to a confined space must be isolated and locked out before entry to prevent inadvertent energisation or introduction of hazardous substances.
Before a worker enters a confined space, all connected services (electrical, hydraulic, pneumatic, thermal, chemical) and plant must be effectively isolated using lockout/tagout or equivalent procedures. The code details requirements for isolation records, verification of isolation, and responsibilities of the person authorising entry.
What
All hazardous services and plant connected to a confined space must be isolated and locked out before entry to prevent inadvertent energisation or introduction of hazardous substances.
Source
legislation.act.gov.au

Full analysis

Free account

What this means for you

Free account

Read the full analysis, tailored to your industry

  • Impact summary tailored to your industry
  • Full plain-English analysis of what changed
  • Email alerts & digests when this law changes
  • Compliance self-assessment tools
Labels
confined spaces isolation lockout tagout plant WHS ACT
Official sources
Frequently asked questions

Which WHS law does this come from?

Isolation of Plant and Services Before Confined Space Entry is a WHS requirement set out in Confined Spaces (ACT). It is made under Work Health and Safety Act 2011 (ACT). The relevant provision is Confined Spaces Code of Practice (NI2025-443).

What does this WHS obligation require?

Isolation of Plant and Services Before Confined Space Entry is a WHS obligation under Confined Spaces (ACT). In short, All hazardous services and plant connected to a confined space must be isolated and locked out before entry to prevent inadvertent energisation or introduction of hazardous substances.

What changed recently?

Isolation of Plant and Services Before Confined Space Entry was last updated on 9 October 2026.

About this Topic

Updates trackedMonitoring
Monitoring detail
First seenOct 2026